{"id":9203,"date":"2024-07-01T21:43:30","date_gmt":"2024-07-01T16:13:30","guid":{"rendered":"https:\/\/matribhumisamachar.com\/en\/?p=9203"},"modified":"2024-07-01T21:43:30","modified_gmt":"2024-07-01T16:13:30","slug":"coal-stocks-ensure-18-5-days-of-thermal-power-plant-operations","status":"publish","type":"post","link":"https:\/\/matribhumisamachar.com\/en\/2024\/07\/01\/coal-stocks-ensure-18-5-days-of-thermal-power-plant-operations\/","title":{"rendered":"Coal Stocks Ensure 18.5 Days of Thermal Power Plant Operations"},"content":{"rendered":"<p style=\"text-align: justify;\">The coal stocks at domestic coal based (DCB) Thermal Power Plants (TPPs) as on 29<sup>th<\/sup>\u00a0June 2024 stands at 44.46 MT which is sufficient to meet requirements of 18.5 days as per present level of consumption.\u00a0 This stock position is 33% higher over stock position of same time during last year.\u00a0 It is to be noted that production of coal during first quarter of this year has seen a growth of 10.58 %.\u00a0 Similarly, supply of coal has seen a growth of 8.50 %.<\/p>\n<p style=\"text-align: justify;\">It is further noteworthy that keeping in view monsoon effect in the coal production, Coal ministry has ensured 98.67 MT stock availability at the pithead of mines (including coal in transit) as on 30<sup>th<\/sup>\u00a0June 2024 which is 33.5 % higher over last year\u2019s position.<\/p>\n<p style=\"text-align: justify;\">Currently the stock availability at the TPP end is 68% of the normative requirement which was about 50% during the same period of last year.\u00a0 It may be noted that during FY 23-24 there was no scarcity of coal at the domestic coal based TPPs. The coal stock at TPPs, as on 31<sup>st<\/sup>\u00a0March 2024, was over 47 MT.\u00a0 This FY also the Coal ministry is planning to maintain similar high stock at TPPs end and also at mine pithead.<\/p>\n<p style=\"text-align: justify;\">As on 29<sup>th<\/sup>\u00a0June 2024, there is also an increase in the number of rakes\/days by 10.54 % over the same period of last year, it is thus evident that adequate stock is available to meet the monsoon requirements of all domestic coal based TPPs.\u00a0 Further Coal, Railways and Power ministries are closely coordinating to ensure adequate availability of coal at all domestic coal based TPPs in the country.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The coal stocks at domestic coal based (DCB) Thermal Power Plants (TPPs) as on 29th\u00a0June 2024 stands at 44.46 MT which is sufficient to meet requirements of 18.5 days as per present level of consumption.\u00a0 This stock position is 33% higher over stock position of same time during last year.\u00a0 It is to be noted &hellip;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[136],"tags":[6112,6110,6111,6109],"class_list":["post-9203","post","type-post","status-publish","format-standard","","category-national","tag-coal-stockpile","tag-domestic-coal-supply","tag-energy-requirements","tag-thermal-power-plants"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v21.8.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Coal Stocks Ensure 18.5 Days of Thermal Power Plant Operations - Matribhumi Samachar English<\/title>\n<meta name=\"description\" content=\"Learn about the sufficient coal stocks at domestic coal based thermal power plants to meet the requirements of 18.5 days. Explore the current situation and potential impacts on energy supply.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/matribhumisamachar.com\/en\/2024\/07\/01\/coal-stocks-ensure-18-5-days-of-thermal-power-plant-operations\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Coal Stocks Ensure 18.5 Days of Thermal Power Plant Operations - Matribhumi Samachar English\" \/>\n<meta property=\"og:description\" content=\"Learn about the sufficient coal stocks at domestic coal based thermal power plants to meet the requirements of 18.5 days. Explore the current situation and potential impacts on energy supply.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/matribhumisamachar.com\/en\/2024\/07\/01\/coal-stocks-ensure-18-5-days-of-thermal-power-plant-operations\/\" \/>\n<meta property=\"og:site_name\" content=\"Matribhumi Samachar English\" \/>\n<meta property=\"article:published_time\" content=\"2024-07-01T16:13:30+00:00\" \/>\n<meta name=\"author\" content=\"Saransh Kanaujia\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Saransh Kanaujia\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/matribhumisamachar.com\/en\/2024\/07\/01\/coal-stocks-ensure-18-5-days-of-thermal-power-plant-operations\/\",\"url\":\"https:\/\/matribhumisamachar.com\/en\/2024\/07\/01\/coal-stocks-ensure-18-5-days-of-thermal-power-plant-operations\/\",\"name\":\"Coal Stocks Ensure 18.5 Days of Thermal Power Plant Operations - Matribhumi Samachar English\",\"isPartOf\":{\"@id\":\"https:\/\/matribhumisamachar.com\/en\/#website\"},\"datePublished\":\"2024-07-01T16:13:30+00:00\",\"dateModified\":\"2024-07-01T16:13:30+00:00\",\"author\":{\"@id\":\"https:\/\/matribhumisamachar.com\/en\/#\/schema\/person\/0a61403f4baf9627e92218b53a1e65f1\"},\"description\":\"Learn about the sufficient coal stocks at domestic coal based thermal power plants to meet the requirements of 18.5 days. Explore the current situation and potential impacts on energy supply.\",\"breadcrumb\":{\"@id\":\"https:\/\/matribhumisamachar.com\/en\/2024\/07\/01\/coal-stocks-ensure-18-5-days-of-thermal-power-plant-operations\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/matribhumisamachar.com\/en\/2024\/07\/01\/coal-stocks-ensure-18-5-days-of-thermal-power-plant-operations\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/matribhumisamachar.com\/en\/2024\/07\/01\/coal-stocks-ensure-18-5-days-of-thermal-power-plant-operations\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/matribhumisamachar.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Coal Stocks Ensure 18.5 Days of Thermal Power Plant Operations\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/matribhumisamachar.com\/en\/#website\",\"url\":\"https:\/\/matribhumisamachar.com\/en\/\",\"name\":\"Matribhumi Samachar English\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/matribhumisamachar.com\/en\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/matribhumisamachar.com\/en\/#\/schema\/person\/0a61403f4baf9627e92218b53a1e65f1\",\"name\":\"Saransh Kanaujia\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/matribhumisamachar.com\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/45a8b03a1b1bb8255014f5e62f9cfea0eb8a9f7a6a604f9879038df08da23cea?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/45a8b03a1b1bb8255014f5e62f9cfea0eb8a9f7a6a604f9879038df08da23cea?s=96&d=mm&r=g\",\"caption\":\"Saransh Kanaujia\"},\"description\":\"Saransh Kanaujia is currently editor of Matribhumi Samachar Group. He earlier worked with Hindusthan Samachar News Agency. He is also associated with many organizations.\",\"sameAs\":[\"https:\/\/matribhumisamachar.com\/en\"],\"url\":\"https:\/\/matribhumisamachar.com\/en\/author\/matribhumisamachar\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Coal Stocks Ensure 18.5 Days of Thermal Power Plant Operations - Matribhumi Samachar English","description":"Learn about the sufficient coal stocks at domestic coal based thermal power plants to meet the requirements of 18.5 days. Explore the current situation and potential impacts on energy supply.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/matribhumisamachar.com\/en\/2024\/07\/01\/coal-stocks-ensure-18-5-days-of-thermal-power-plant-operations\/","og_locale":"en_US","og_type":"article","og_title":"Coal Stocks Ensure 18.5 Days of Thermal Power Plant Operations - Matribhumi Samachar English","og_description":"Learn about the sufficient coal stocks at domestic coal based thermal power plants to meet the requirements of 18.5 days. Explore the current situation and potential impacts on energy supply.","og_url":"https:\/\/matribhumisamachar.com\/en\/2024\/07\/01\/coal-stocks-ensure-18-5-days-of-thermal-power-plant-operations\/","og_site_name":"Matribhumi Samachar English","article_published_time":"2024-07-01T16:13:30+00:00","author":"Saransh Kanaujia","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Saransh Kanaujia","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/matribhumisamachar.com\/en\/2024\/07\/01\/coal-stocks-ensure-18-5-days-of-thermal-power-plant-operations\/","url":"https:\/\/matribhumisamachar.com\/en\/2024\/07\/01\/coal-stocks-ensure-18-5-days-of-thermal-power-plant-operations\/","name":"Coal Stocks Ensure 18.5 Days of Thermal Power Plant Operations - Matribhumi Samachar English","isPartOf":{"@id":"https:\/\/matribhumisamachar.com\/en\/#website"},"datePublished":"2024-07-01T16:13:30+00:00","dateModified":"2024-07-01T16:13:30+00:00","author":{"@id":"https:\/\/matribhumisamachar.com\/en\/#\/schema\/person\/0a61403f4baf9627e92218b53a1e65f1"},"description":"Learn about the sufficient coal stocks at domestic coal based thermal power plants to meet the requirements of 18.5 days. Explore the current situation and potential impacts on energy supply.","breadcrumb":{"@id":"https:\/\/matribhumisamachar.com\/en\/2024\/07\/01\/coal-stocks-ensure-18-5-days-of-thermal-power-plant-operations\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/matribhumisamachar.com\/en\/2024\/07\/01\/coal-stocks-ensure-18-5-days-of-thermal-power-plant-operations\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/matribhumisamachar.com\/en\/2024\/07\/01\/coal-stocks-ensure-18-5-days-of-thermal-power-plant-operations\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/matribhumisamachar.com\/en\/"},{"@type":"ListItem","position":2,"name":"Coal Stocks Ensure 18.5 Days of Thermal Power Plant Operations"}]},{"@type":"WebSite","@id":"https:\/\/matribhumisamachar.com\/en\/#website","url":"https:\/\/matribhumisamachar.com\/en\/","name":"Matribhumi Samachar English","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/matribhumisamachar.com\/en\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/matribhumisamachar.com\/en\/#\/schema\/person\/0a61403f4baf9627e92218b53a1e65f1","name":"Saransh Kanaujia","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/matribhumisamachar.com\/en\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/45a8b03a1b1bb8255014f5e62f9cfea0eb8a9f7a6a604f9879038df08da23cea?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/45a8b03a1b1bb8255014f5e62f9cfea0eb8a9f7a6a604f9879038df08da23cea?s=96&d=mm&r=g","caption":"Saransh Kanaujia"},"description":"Saransh Kanaujia is currently editor of Matribhumi Samachar Group. He earlier worked with Hindusthan Samachar News Agency. He is also associated with many organizations.","sameAs":["https:\/\/matribhumisamachar.com\/en"],"url":"https:\/\/matribhumisamachar.com\/en\/author\/matribhumisamachar\/"}]}},"_links":{"self":[{"href":"https:\/\/matribhumisamachar.com\/en\/wp-json\/wp\/v2\/posts\/9203","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/matribhumisamachar.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/matribhumisamachar.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/matribhumisamachar.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/matribhumisamachar.com\/en\/wp-json\/wp\/v2\/comments?post=9203"}],"version-history":[{"count":1,"href":"https:\/\/matribhumisamachar.com\/en\/wp-json\/wp\/v2\/posts\/9203\/revisions"}],"predecessor-version":[{"id":9224,"href":"https:\/\/matribhumisamachar.com\/en\/wp-json\/wp\/v2\/posts\/9203\/revisions\/9224"}],"wp:attachment":[{"href":"https:\/\/matribhumisamachar.com\/en\/wp-json\/wp\/v2\/media?parent=9203"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/matribhumisamachar.com\/en\/wp-json\/wp\/v2\/categories?post=9203"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/matribhumisamachar.com\/en\/wp-json\/wp\/v2\/tags?post=9203"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}