Please enable JavaScript
Powered by Benchmark
Friday, September 18 2026 | 07:52:56 PM

Guidelines for Green Hydrogen Implementation under SIGHT Scheme

Saransh Kanaujia
Saransh Kanaujia - Editor
2 Min Read

The Scheme Guidelines for implementation of “Strategic Interventions for Green Hydrogen Transition (SIGHT) Programme – Component II: Incentive Scheme for Green Hydrogen Production (under Mode 1)- Tranche-II” have been notified by MNRE on 03rd July 2024.

The capacity of Tranche-II will be 450,000 TPA of Green Hydrogen, with 40,000 TPA capacity reserved for biomass-based pathways (bucket-II) and the rest for technology agnostic pathways (bucket-I). Solar Energy Corporation of India (SECI) is the implementing agency for this tranche as well. The Request for Selection (RfS) shall be issued by SECI shortly.

The bidding shall be based on the least average incentive quoted by the bidder. The minimum bid under bucket-I is 10,000 TPA while the maximum bid is 90,000 TPA. The minimum bid capacity in bucket-II is 500 TPA and the maximum capacity is 4000 TPA. A bidder can bid in any or both buckets. The maximum capacity which a single bidder can be allotted in this tranche is 90,000 TPA.

The National Green Hydrogen Mission was launched on 4th January 2023, with an outlay of Rs. 19,744 crores up to FY 2029-30. It will contribute to India’s goal to become Aatma Nirbhar (self-reliant) through clean energy and serve as an inspiration for the global Clean Energy Transition. The Mission will lead to significant decarbonisation of the economy, reduced dependence on fossil fuel imports, and enable India to assume technology and market leadership in Green Hydrogen.

Related Post

Share This Article
Follow:
Saransh Kanaujia is a journalist and editor associated with Matribhumi Samachar Group, covering Indian national affairs, business and economy, technology, government policies, and other major developments. His work focuses on providing timely news coverage, explainers and updates for readers in India and abroad.