Please enable JavaScript
Powered by Benchmark Mineral Production in the Country Grows by 8 percent in February, Compared to Last Year - Matribhumi Samachar English
Saturday, November 23 2024 | 05:40:48 AM
Home / Business News / Mineral Production in the Country Grows by 8 percent in February, Compared to Last Year

Mineral Production in the Country Grows by 8 percent in February, Compared to Last Year

Follow us on:

The index of mineral production of mining and quarrying sector for the month of February, 2024 (Base: 2011-12=100) at 139.6 is 8.0% higher as compared to the level in the month of February, 2023. As per the provisional statistics of Indian Bureau of Mines (IBM), the cumulative growth for the period April-February, 2023-24 over the corresponding period of previous year is 8.2%.

Production level of important minerals in February, 2024 were: Coal 966 lakh tonne, Lignite 42 lakh tonne, Natural gas (utilized) 2886 million cu.m., Petroleum (crude) 23 lakh tonne, Bauxite 2414 thousand tonne, Chromite 400 thousand tonne, Copper conc. 11 thousand tonne , Gold 255 kg, Iron ore 244 lakh tonne, Lead conc. 27 thousand tonne, Manganese ore 295 thousand tonne, Zinc conc. 149 thousand tonne, Limestone 387 lakh tonne, Phosphorite 218 thousand tonne, and Magnesite 10 thousand tonne .

Important minerals showing positive growth during February, 2024 over February, 2023 include: Gold (86%), Copper Conc.(28.7%), Bauxite (21%), Chromite (21%), Phosphorite (19%), Limestone(13%), Coal (12%), Natural gas (U) (11%), Petroleum(crude) (8%), Manganese Ore (6%), Magnesite (3%), Lignite(2.8%), and Zinc Conc.(2.8%). Other important minerals showing negative growth include Iron Ore (-0.7%) and Lead Conc.(-14%).

मित्रों,
मातृभूमि समाचार का उद्देश्य मीडिया जगत का ऐसा उपकरण बनाना है, जिसके माध्यम से हम व्यवसायिक मीडिया जगत और पत्रकारिता के सिद्धांतों में समन्वय स्थापित कर सकें। इस उद्देश्य की पूर्ति के लिए हमें आपका सहयोग चाहिए है। कृपया इस हेतु हमें दान देकर सहयोग प्रदान करने की कृपा करें। हमें दान करने के लिए निम्न लिंक पर क्लिक करें -- Click Here


* 1 माह के लिए Rs 1000.00 / 1 वर्ष के लिए Rs 10,000.00

Contact us

About MaSS English

Check Also

Raghu Vamsi Aerospace Group Lays Foundation Stone to Build New Facility in Hyderabad with the Investment of Rs.300 Crore

Laid the foundation stone by Shri D. Sridhar Babu, Minister of IT, Electronics, Communications, Industries …