CEA with the aim of transmitting of 500 GW of Renewable Energy installed capacity by the year 2030 and over 600 GW of Renewable Energy installed capacity by the year 2032, prepared the detailed Nation Electricity Plan (Transmission) in consultation with various Stakeholders. The same was launched by the Union Minster Shri …
Read More »